The Problem: Your new racking system is sitting on pallets in the staging area, but your team doesn't have the expertise or equipment to install it safely. DIY installation risks structural failure, voided warranties, and CSA non-compliance.
Why It Matters: Improperly installed racking is the #1 cause of warehouse collapse incidents. Misaligned uprights, under-torqued bolts, and incorrect anchor patterns create invisible structural weaknesses. Insurance claims get denied when installation doesn't meet code. One forklift impact on a poorly anchored system can bring down an entire row.
Our Solution: Our certified installation crews handle every phase — from concrete anchor drilling to final plumb and level verification. Every system is installed to manufacturer specs and CSA A344.1 standards. You get a post-installation inspection report confirming compliance, and your warranty stays intact.
We assess your facility's floor conditions, confirm anchor specifications, verify clearances, and create an installation sequence that minimizes operational disruption.
2
Site Preparation
Floor marking, layout verification, and staging area setup. We coordinate with your team to clear installation zones while keeping adjacent areas operational.
3
Installation & Assembly
Concrete anchor drilling, upright placement, beam installation, and accessory mounting. Every connection is torqued to specification and documented.
4
Quality Verification
Laser plumb and level verification, torque documentation, anchor pull-testing, and post-installation inspection. You receive as-built drawings and a compliance certificate.
What's Included
Everything in Our Service Package
Pre-installation site survey
Concrete anchor drilling & testing
Component assembly & alignment
Plumb/level verification (laser)
Torque documentation
Post-installation inspection
As-built drawings
Compliance certificate
Clean-up & debris removal
Pricing Transparency
Upfront pricing so you can plan with confidence
Standard Installation
$35/position
Per pallet position, standard hours
Starting Price
Express Installation
+25%
Accelerated timeline available
Starting Price
Weekend/Off-Hours
Custom Quote
Install outside business hours
Starting Price
Final pricing depends on project scope and complexity. Request a custom quote for your specific project.
Trusted by Ontario Businesses
Results that speak for themselves
10,000+
Bays Installed
99.8%
On-Time Completion
Zero
Safety Incidents
200 bays installed over a weekend with zero disruption to Monday operations. The crew was professional, clean, and thorough.
Operations Manager
3PL Warehouse
Frequently Asked Questions
Common Questions Answered
Most installations take 2-5 days depending on system size and complexity. A 100-bay selective racking system typically takes 2-3 days. We provide a detailed schedule before starting.
Yes. We regularly perform weekend and overnight installations to minimize disruption to your operations. Weekend/off-hours installation is quoted separately.
Yes, all installations include concrete anchor drilling with pull-testing to verify anchor capacity. We use wedge anchors rated for your system's load requirements per CSA A344.1.
All our installations are engineered for Ontario's seismic requirements. For higher seismic zones, we specify appropriate bracing and connection details per the National Building Code.
What Typically Comes Next
Related services our clients often bundle
Supply & Design
Need racking designed for your space? Our engineers create optimized layouts before installation.