416 came in mid-Black-Friday, phased the install around our peak hours, and we never had a forklift wait on a free pick face. They earned the rest of the building on that one job.
Sarah Chen
Operations Director · GTA Fulfillment Co.
Logo · Sprint BToronto's full-service pallet racking team — design, supply, install, inspect, repair. One quote, one timeline, one accountable salaried crew. No subcontractors, no surprises.
Engineered design, supplied product, installed by a salaried crew, inspected on schedule, repaired when forklifts find frames — every step accountable to the same Toronto team.
Selective, push-back, drive-in, VNA, cantilever, pallet flow. Teardrop + structural systems engineered for your floor plan, building code, and seismic class.
Learn More
P.Eng-stamped industrial mezzanines — decking, stair systems, gates. Wire mesh partitions and security cages for high-value SKU zones.
Learn More
CSA A344-17-aligned inspections with signed PDF reports, MLITSD-ready filing. Same-day repair acknowledgement, 24-48hr on-site response across the GTA.
Learn More
Inspected, stamped, guaranteed used racking inventory. We also buy back surplus racking — 24-hour estimate, clean teardown, scheduled removal.
Learn MoreP.Eng-stamped drawings + municipal permit coordination + single accountable project manager.
Learn More ›GTA businesses: walk-the-floor audit + signed report at no charge. Find damage before MLITSD does.
Book Audit ›Past 416 clients: beams, uprights, footplates, decking. Same-day quote, restock in days, not weeks.
Reorder ›Forklift hit a frame? Same-day acknowledgement, 24-48hr on-site response. Floor stays operational.
Call Repair ›From the first floor walk to the inspection sign-off, the same Toronto crew owns every step. No handoffs, no subcontractors, no "that's a different department."
We come out, walk the floor, measure clear heights, sprinkler clearances, column grid, forklift type. You get the scope in writing.
P.Eng-stamped CAD drawings, capacity calcs, code-aligned layout. Fixed quote with no surprise extras. 24-hour turnaround on most jobs.
Same 416 crew that quoted the job installs it. Anchor-tested, level-checked, photographed. Floor stays operational with night/weekend phasing.
Signed PDF inspection report, MLITSD-ready filing format, replacement-part list. Annual re-inspection cadence set with your ops team.
Specialized racking systems and install patterns for the four GTA-dense industries where downtime costs the most.
Pallet flow, selective with carton flow, VNA for high-bay SKU sprawl. Designed for 24/7 forklift traffic and seasonal pallet flux.
Explore 3PL Solutions →
Galvanized + epoxy-coated systems engineered for -25°C operations. Tight aisle drive-in for cubic-foot density without losing FIFO.
Explore Cold Storage Solutions →
Pre-finished, gasket-sealed systems for CFIA-regulated zones. Mezzanines for batch staging, allergen separation, lot-traceability.
Explore F&B Solutions →
Lumber, pipe, sheet goods, dies, mold storage. Custom load classes per shelf, P.Eng-stamped for over-3000lb capacity tiers.
Explore Manufacturing Solutions →
A Mississauga 3PL needed to triple pallet positions in an active fulfillment building without slowing inbound or outbound. We designed selective + push-back in mixed zones, phased the install around peak-hour cutovers, and handed back a signed inspection package the day the last rack went up.
If your floor is inside the Golden Horseshoe, our salaried crew is on it within 24-48 hours for service calls. Quote response is same-business-day.
Toronto Head Office
416 Industrial Inc.
Greater Toronto Area · Mobile-first crew
Mon–Fri 7am–6pm · Sat by appointment
Emergency: (647) 692-4416 · 24/48hr on-site
info@416industrial.com
Operations directors and plant managers who came back for second, third, and fourth projects — and who let us put their words on this page.
416 came in mid-Black-Friday, phased the install around our peak hours, and we never had a forklift wait on a free pick face. They earned the rest of the building on that one job.
Sarah Chen
Operations Director · GTA Fulfillment Co.
Logo · Sprint BCold-chain racking is unforgiving — the wrong finish flakes inside six months. 416 spec'd galvanized + epoxy without me asking. Two years in, zero rework, zero complaints.
Marcus Reyes
VP Operations · Cold Chain Logistics Ontario
Logo · Sprint BCFIA inspector showed up two weeks after install and signed off without a single deficiency. The same crew did the original quote, the install, and the inspection coordination. That's rare.
Priya Patel
Plant Manager · Mississauga Food Co.
Logo · Sprint BSame crew quotes, designs, installs, and inspects every system below. Density gains are measured against selective baseline at equal building footprint.
| System | Density Gain | Capacity | Best For | Detail |
|---|---|---|---|---|
| Selective Pallet | Baseline | Up to 5,000 lb / pallet | SKU variety · 100% pick face access | Spec › |
| Push-Back | +90% | 2,500 lb / pallet | LIFO inventory · 2–6 deep | Spec › |
| Very-Narrow Aisle (VNA) | +50% | 5–6 ft aisles · up to 45 ft height | High-bay SKU sprawl · wire-guided | Spec › |
| Drive-In | +75% | High-density · galvanized + epoxy | Cold storage · same-SKU bulk | Spec › |
| Cantilever | N/A | Long / awkward loads · custom arms | Lumber · pipe · sheet goods | Spec › |
| Pallet Flow | +85% | FIFO gravity flow · rolling lanes | High-velocity SKU rotation | Spec › |
Case studies, install timelapses, and code updates worth knowing about — written by the crew that does the work.
Three free tools that walk you through capacity, density, and terminology so the first phone call is about the project, not the basics.
Plug in pallet dimensions, building height, and aisle width — get capacity counts in seconds for every rack type we install.
Use the ToolStorage density planner. Compare selective vs push-back vs drive-in vs VNA for your exact building footprint and SKU mix.
Plan Your Floor50+ rack industry terms plain-English defined. Selective vs structural, anchor pull-out tests, what CSA A344 actually requires, and more.
Read the GuideMost quotes come back inside 24 business hours. If you need P.Eng-stamped drawings or municipal permit coordination, we'll flag the timeline up-front.
Request a Quote