ACTIVE GTA INSTALLS · SAME-DAY EMERGENCY DESK OPEN SERVING 14 GTA CITIES · ONE SALARIED IN-HOUSE CREW CSA A344-17 + ANSI MH16.1 ALIGNED · SIGNED REPORTS INCLUDED 220,000 SQ FT INSTALLED · GTA RACKING SINCE 2011 WSIB INSURED · NO SUBS · NO RUNAROUND
A loaded orange pallet racking aisle receding to a vanishing point
Toronto's own pallet racking crew · Est. 2011

The racking crew that never subs out.

Designed, supplied, installed and inspected by one crew.

Spec your warehouse 60 seconds · no obligation · same-day reply Or call (647) 692-4416
Trusted across the GTA
3PLCold StorageFood & BevManufacturingAutomotiveE-Commerce
NEWInteractive

Build your warehouse in 60 seconds.

Pick your space, your racking, your add-ons — and watch it come together on screen, piece by piece. Get an instant ballpark, and our crew makes it real. No account, no obligation.

01Space02Racking03Height04Safety05Extras
Spec your warehouse →
// Live isometric builder · instant ballpark · downloadable spec sheet
Interactive isometric warehouse racking builder preview

Get a real number. Today.

Square footage, industry, timeline — our crew comes back same-day with a real quote. Not a runaround.

A real person from the crew replies same-day — no call-centre, no bots. Or call (647) 692-4416 direct.
220K
Sq ft installed
14
GTA cities served
15
Years since 2011
100%
In-house crew
Built to the standards that pass inspection
CSA A344-17 ANSI MH16.1 / RMI P.Eng of record WSIB insured Permit-ready In-house since 2011
02 / The 416 difference

Why the modern operators call us.

01 — Accountability

One salaried crew

No subcontractors, no rotating day-labour. The same trained, in-house team scopes your job, installs it, and answers for it. The face at the quote is the face on site.

02 — Engineering

P.Eng of record

Layouts engineered to CSA A344-17 + ANSI MH16.1 / RMI and sealed by our P.Eng of record when your project needs the stamp — load-rated, permit-ready, built to pass the first inspection.

03 — Speed

Same-day emergency desk

Beam down? Forklift strike? Same-day acknowledgement across the GTA and a crew dispatched fast. Downtime in a live warehouse costs far more than the repair ever will.

04 — Focus

GTA-only, on purpose

Fourteen cities, one local crew that already knows your municipality's permits and your building's code. Closer means faster.

03 / Recent installs

Racked, stamped, signed off.

A slice of what one accountable crew ships across the GTA — representative recent installs.

// Representative installs — named client case studies expand as Sprint B permissions land.

04 / The crew

The people who actually show up.

No call-centre, no rotating subs. The same salaried team from quote to sign-off.

Project Manager

Your single point of contact — quote to completion.
One number, start to finish

P.Eng of record

Our engaged Professional Engineer — stamps + load-rates every layout we install.
Engineer of record · CSA A344-17

Lead Installer

Runs the salaried install crew on every site.
In-house · WSIB insured

Rack Inspector

Annual inspections, repairs + same-day emergency.
Certified inspections

// Real crew photos + names drop with the Sprint B shoot — structure ready.

05 / The 416 Lifecycle

One crew. Designed to stamped.

Six stages — scoped, supplied and installed by a salaried crew that never subs out, sealed by our P.Eng of record. Every step answered by the people who do the next one.

  1. 01 · Design & Engineer

    Drawn to the bay

    We draw your layout to the bay — aisles, heights and forklift clearances, engineered to code with our P.Eng of record.

  2. 02 · Supply

    We source the steel

    Selective, drive-in, cantilever or VNA — the right system for your operation, supplied direct.

  3. 03 · Install

    Our own crew erects it

    Our salaried crew builds it to the timeline we committed to. No subcontractors, ever.

  4. 04 · Inspect

    Checked, not assumed

    Every upright, beam and anchor checked against CSA A344-17 before we hand it over.

  5. 05 · P.Eng Stamp

    Sealed & permit-ready

    Sealed by our Professional Engineer of record — load-rated, compliant, and ready for the permit office.

  6. 06 · Relocate & Maintain

    For the life of the rack

    Annual inspections, repairs, and teardown or relocation when you move. One crew, start to finish.

Design → Supply → Install → Inspect → Stamp → Relocate — one accountable crew, start to finish. Spec your warehouse →
06 / Rack-safety check

Worried about a leaning upright?

A beam that's bowing or a footplate that's been clipped doesn't fix itself. Send us photos — a Professional Engineer gives it a real look.

  1. Snap your rackingPhone photos of the damage, the aisle and the load tag.
  2. Send it overEmail or text — no forms, no sales call to book it.
  3. Get a P.Eng eyeA Professional Engineer flags what's urgent and what can wait.
Get your racking checked →
PHOTOS
P.ENG EYE
A Professional Engineer, not a chatbot

A proper damage assessment — read by a Professional Engineer, not a chatbot.

// Send photos to the crew · same-day acknowledgement, engineer review to follow
07 / Trusted across the GTA

If it needs to be there by Tuesday — it's there.

From 3PLs to cold storage to manufacturing, across fourteen GTA cities.

// Client logo wall — drops as Sprint B permissions land. Layout ready.

10 / Straight answers

Asked every week.

The six questions every GTA operator asks first. Full list on the FAQ page.

How often should our racking be inspected?

CSA A344-17 recommends annual inspection by a competent person, plus immediate post-impact inspection any time a forklift or other equipment makes contact with a rack frame. For high-velocity warehouses, we recommend semi-annual visual inspections by the operator’s own staff plus the annual certified inspection by 416.

Do I need a P.Eng stamp on my drawings?

It depends. Ontario Building Code requires engineering review for racking over 8 ft when used to support pedestrian areas, and most municipalities require stamped drawings for permits on systems over 25 ft tall or with seismic considerations. Our P.Eng of record reviews and stamps these projects under our scope.

How do I know if I need a permit for my racking?

Send us your address + the racking spec. We’ll confirm in 24 hours whether a permit is required — and document the answer in writing either way. Common triggers: over 25 ft tall, mezzanine-mounted, supports pedestrian access, or in a seismic-rated building.

How quickly can you start an install?

Standard scheduling is 2-3 weeks out. If you have a pressing deadline (lease expiry, ops launch, peak season), we can usually accommodate a 5-7 day rush with after-hours or weekend crew at a 15-20% premium.

How quickly can you respond to an impact event?

Same-day acknowledgement, on-site within 24-48 hours for active GTA accounts. We maintain an on-call inspector rotation specifically for this. Call (647) 692-4416 and ask for emergency dispatch.

Can you install racking we bought from someone else?

Yes. Most of our installs are on systems we supplied, but we’ll install any major manufacturer’s rack — Ridg-U-Rak, Steel King, Interlake Mecalux, Frazier, Mecalux. We’ll work from the manufacturer’s spec sheet and apply the same install methodology.

Get a quote in
60 seconds.

Square footage, industry, timeline. We come back same-day with a real number — not a runaround.

Serving the GTA · WSIB insured · same-day response · since 2011

Spec your warehouse →