ACTIVE GTA INSTALLS · SAME-DAY EMERGENCY DESK OPEN SERVING 14 GTA CITIES · ONE SALARIED IN-HOUSE CREW P.ENG-STAMPED TO CSA A344-17 + ANSI MH16.1 · INCLUDED 220,000 SQ FT INSTALLED · GTA RACKING SINCE 2011 WSIB INSURED · NO SUBS · NO RUNAROUND
A loaded orange pallet racking aisle receding to a vanishing point
Toronto's in-house pallet racking crew · Est. 2011

The racking crew that never subs out.

Designed, supplied, installed, inspected by one salaried in-house crew — and P.Eng-stamped. Same-day across the GTA.

Spec your warehouse 60 seconds · no obligation · same-day GTA Or call (647) 692-4416
Trusted across the GTA
3PLCold StorageFood & BevManufacturingAutomotiveE-Commerce
NEWInteractive

Build your warehouse in 60 seconds.

Pick your space, your racking, your add-ons — and watch it come together on screen, piece by piece. Get an instant ballpark, and our crew makes it real. No account, no obligation.

01Space02Racking03Height04Safety05Extras
Spec your warehouse →
// Live isometric builder · instant ballpark · downloadable spec sheet
Interactive isometric warehouse racking builder preview

Get a real number. Today.

Square footage, industry, timeline — our crew comes back same-day with a real quote. Not a runaround.

A real person from the crew replies same-day — no call-centre, no bots. Or call (647) 692-4416 direct.
220K
Sq ft installed
14
GTA cities served
15
Years since 2011
100%
P.Eng-stamped
Built to the standards that pass inspection
CSA A344-17 ANSI MH16.1 / RMI P.Eng-stamped WSIB insured Permit-ready In-house since 2011
02 / The 416 difference

Why the modern operators call us.

01 — Accountability

One salaried crew

No subcontractors, no rotating day-labour. The same trained, in-house team scopes your job, installs it, and answers for it. The face at the quote is the face on site.

02 — Engineering

P.Eng-stamped — included

Every layout engineered and stamped to CSA A344-17 + ANSI MH16.1 / RMI — load-rated, permit-ready, built to pass the first inspection. In the price.

03 — Speed

Same-day emergency

Beam down? Forklift strike? We respond same-day across the GTA. Downtime in a live warehouse costs far more than the repair ever will.

04 — Focus

GTA-only, on purpose

Fourteen cities, one local crew that already knows your municipality's permits and your building's code. Closer means faster.

03 / Recent installs

Racked, stamped, signed off.

A slice of what one accountable crew ships across the GTA — representative recent installs.

// Representative installs — named client case studies expand as Sprint B permissions land.

04 / The crew

The people who actually show up.

No call-centre, no rotating subs. The same salaried team from quote to sign-off.

Project Manager

Your single point of contact — quote to completion.
One number, start to finish

P.Eng of record

Our engaged Professional Engineer — stamps + load-rates every layout we install.
Engineer of record · CSA A344-17

Lead Installer

Runs the salaried install crew on every site.
In-house · WSIB insured

Rack Inspector

Annual inspections, repairs + same-day emergency.
Certified inspections

// Real crew photos + names drop with the Sprint B shoot — structure ready.

05 / The 416 Lifecycle

One crew. Designed to stamped.

Six stages — scoped, supplied and installed by a salaried crew that never subs out, sealed by our P.Eng of record. Every step answered by the people who do the next one.

  1. 01 · Design & Engineer

    Drawn to the bay

    We draw your layout to the bay — aisles, heights and forklift clearances, engineered to code with our P.Eng of record.

  2. 02 · Supply

    We source the steel

    Selective, drive-in, cantilever or VNA — the right system for your operation, supplied direct.

  3. 03 · Install

    Our own crew erects it

    Our salaried crew builds it to the timeline we committed to. No subcontractors, ever.

  4. 04 · Inspect

    Checked, not assumed

    Every upright, beam and anchor checked against CSA A344-17 before we hand it over.

  5. 05 · P.Eng Stamp

    Sealed & permit-ready

    Sealed by our Professional Engineer of record — load-rated, compliant, and ready for the permit office.

  6. 06 · Relocate & Maintain

    For the life of the rack

    Annual inspections, repairs, and teardown or relocation when you move. One crew, start to finish.

Design → Supply → Install → Inspect → Stamp → Relocate — one accountable crew, start to finish. Spec your warehouse →
06 / Rack-safety check

Worried about a leaning upright?

A beam that's bowing or a footplate that's been clipped doesn't fix itself. Send us photos — a Professional Engineer gives it a real look.

  1. Snap your rackingPhone photos of the damage, the aisle and the load tag.
  2. Send it overEmail or text — no forms, no sales call to book it.
  3. Get a P.Eng eyeA Professional Engineer flags what's urgent and what can wait.
Get your racking checked →
PHOTOS
P.ENG EYE
A Professional Engineer, not a chatbot

A proper damage assessment — read by a Professional Engineer, not a chatbot.

// Send photos to the crew · same-day acknowledgement, engineer review to follow
07 / Trusted across the GTA

If it needs to be there by Tuesday — it's there.

From 3PLs to cold storage to manufacturing, across fourteen GTA cities.

// Client logo wall — drops as Sprint B permissions land. Layout ready.

Get a quote in
60 seconds.

Square footage, industry, timeline. We come back same-day with a real number — not a runaround.

Serving the GTA · WSIB insured · same-day response · since 2011

Spec your warehouse →