CASE STUDIES

Real projects. Measurable results. See how we've transformed warehouses across the GTA.

42% increase

Mississauga Food Distribution Center

Food & Beverage Distribution
Racking

Challenge

Outgrew existing selective racking with need for 40% more pallet positions without expanding facility footprint. Cold storage environment (-20°C) required structural-grade materials.

Solution

Replaced legacy roll-formed racking with structural selective racking on perimeter walls plus drive-in racking for bulk frozen items in center aisles. Added new wire decking and column protectors throughout.

+42%
Pallet Capacity
$180K
Avoided Expansion
0
Safety Incidents
-2d
Ahead Schedule

Project Scope: 28,000 sq ft facility • 3-week install • Structural + drive-in racking • Wire decking • Column protectors

Similar Project? Get a Quote
3x faster

Brampton E-Commerce Fulfillment Hub

E-Commerce / 3PL
Racking

Challenge

Online order volume tripled in 18 months. Existing shelving couldn't support pick-and-pack operations. Needed to process 5,000+ orders/day without errors.

Solution

Designed multi-level pick module with mezzanine platform, carton-flow racking for fast-moving SKUs, and selective racking for reserve inventory. Integrated conveyor tie-ins for automated sort.

3x
Faster Processing
99.7%
Pick Accuracy
2,400
New Pick Faces
14mo
Payback Period

Project Scope: 45,000 sq ft facility • 6-week design + install • Mezzanine • Carton-flow • Selective • Conveyor integration

Similar Project? Get a Quote
100% compliant

Toronto Auto Parts Warehouse Inspection & Repair

Automotive Parts Distribution
Inspection

Challenge

Aging racking system (15+ years) showing visible damage. Failed previous third-party inspection. Insurance company threatening to void coverage without remediation.

Solution

Comprehensive rack inspection per CSA A344.2 standard. Identified 47 damaged components across 120 bays. Performed surgical repairs using rack repair kits on 32 uprights. Replaced 15 critically damaged uprights and 28 beams. Added column protectors at all aisle ends.

100%
Compliance Achieved
47
Components Fixed
$95K
Saved vs. Replacement
12mo
Repair Warranty

Project Scope: 18,000 sq ft facility • 2-week inspection + repair • 47 components repaired/replaced • Column protectors installed

Similar Project? Get a Quote
99.9% FIFO

Vaughan Pharmaceutical Distribution Warehouse

Healthcare & Pharmaceutical
Shelving

Challenge

Required temperature-controlled, FIFO-compliant storage for pharmaceutical products. Existing shelving couldn't maintain batch traceability or meet Health Canada storage requirements.

Solution

Installed pallet flow racking for FIFO bulk inventory, carton-flow shelving for pick-and-pack, and climate-controlled mezzanine for high-value products. Integrated barcode-ready lane guides for lot tracking.

99.9%
FIFO Compliance
680
New Pick Positions
$220K
Annual Savings
2wk
Install Time

Project Scope: 32,000 sq ft facility • 2-week install • Pallet flow + carton flow • Mezzanine • Climate-controlled zones

Similar Project? Get a Quote
Zero downtime

Scarborough Automotive Parts Relocation

Automotive Manufacturing
Relocation

Challenge

Needed to relocate 1,200 pallet positions of automotive parts from aging facility to new 50,000 sq ft building in Scarborough, with zero production downtime during peak season.

Solution

Phased weekend relocation over 4 weekends. Disassembled, transported, and reinstalled selective and cantilever racking. Redesigned layout for new building dimensions, adding 300 additional positions. Coordinated with production schedule.

0
Days Downtime
+25%
More Positions
4wk
To Complete
$340K
Saved vs New

Project Scope: 50,000 sq ft new facility • 4-weekend phased move • 1,500 pallet positions • Selective + cantilever

Similar Project? Get a Quote

Have a SIMILAR PROJECT?

Whether you need a complete racking system redesign, an inspection and safety audit, or a high-density storage solution for your growing operation — we're ready to deliver results that measurably improve your warehouse efficiency.