Skip to main content
Pickering · GTA-Wide · Since 2011
Pickering · Ontario

Pallet racking installation in Pickering, by the GTA team that lives here.

Supply, design, install, inspect, repair, relocate. Salaried 416 crew — no subcontractors. CSA A344-17 aligned. 2-3 weeks for new installs · 24-48hr on-site for emergency repair.

Serving Pickering's warehouse operators.

Pickering's industrial activity centres on Brock Road and the nuclear-adjacent supplier ecosystem feeding the OPG station — specialty fabricators, valve and pump distributors, and the precision parts suppliers that nuclear operators trust. These floors prize documentation: every rack hit gets logged, every repair gets a signed report, every inspection gets filed in a way that satisfies CNSC adjacent auditors. 416 brings that documentation discipline by default — signed PDF reports, full part traceability, P.Eng-stamped drawings on every install. Same crew quotes the job and signs the inspection.

Industries served
nuclear supplier ecosystem · specialty fabrication · distribution · light manufacturing
Neighbourhoods we work in
Brock Industrial · Liverpool · Bay Ridges · Whitevale · Cherrywood
Lead time
2-3 weeks for new installs · same-day acknowledgement on emergency repair · 24-48 hr on-site
Compliance
CSA A344-17 aligned · ANSI MH16.1 (RMI) · Bill 41 documented · WSIB insured

Why 416 for Pickering warehouse operators.

Salaried crew — predictable timelineNo subcontractors. The team that quotes the job is the team that installs it and signs the inspection. Schedule slip risk: structurally lower than the multi-sub model.
GTA-based — same-day emergencyBrampton, Vaughan, Markham — doesn't matter where in the GTA the rack hit happened. We acknowledge same-day, on-site inside 48 hours. National chains can't match this.
P.Eng-stamped on every installStamped drawings, load placards, anchor-pull documentation. Municipal-permit-ready. Audits pass first time — we've never had a Pickering-area install fail a third-party inspection.
CSA A344-17 aligned — defensible documentationInspection reports formatted MLITSD-ready for filing. Repair logs traceable per upright. The package your insurer and inspector actually want.

Recently completed in Pickering.

Pickering case studies coming Q3 2026

We're working with several recent Pickering clients on case-study permissions. In the meantime, the case-studies index has reference projects from across the GTA.

Browse all case studies →
Also serving nearby cities

Ready to start a Pickering project?

Send your floor plan and we'll come back with a quote within 5 business days. Or call to walk through the project on the phone.

Quote in 60 sec