The Problem: You're closing a facility, reconfiguring your layout, or replacing outdated racking. But you can't just pull it apart with a forklift — uncontrolled disassembly creates collapse risk, floor damage, and environmental liability.
Why It Matters: Rack systems under load are under tension. Removing the wrong component first can cause cascading failures. Anchor bolts leave holes in your concrete that need professional remediation. And if you're in a leased building, the landlord expects the floor returned in good condition.
Our Solution: Our decommissioning crews follow engineered removal sequences that prevent structural failures. Every component is removed, sorted, and staged for disposal, recycling, or resale. Anchor holes are filled and floors are remediated. You get a clean facility ready for its next use.
Engineered removal sequence that prevents structural failures. We plan the order of disassembly to maintain stability throughout the process.
2
Bay Unloading Coordination
We coordinate with your team to systematically unload bays in the correct sequence. Staging areas are designated for inventory and components.
3
Systematic Disassembly
Component-by-component removal following the engineered sequence. Materials sorted for reuse, recycling, or disposal as specified.
4
Floor Remediation & Cleanup
Anchor bolt removal, hole filling, floor patching, and final cleanup. The facility is returned in clean, lease-return condition.
What's Included
Everything in Our Service Package
Engineered removal sequence
Supervised bay unloading
Systematic component removal
Material sorting (reuse/recycle/dispose)
Anchor bolt removal
Floor patching & remediation
Debris removal & disposal
Environmental compliance documentation
Pricing Transparency
Upfront pricing so you can plan with confidence
Standard Decommission
$25/position
Per pallet position removed
Starting Price
Floor Remediation
Custom Quote
Quoted based on floor condition
Starting Price
Salvage Credit
Offset Available
Salvage value may reduce costs
Starting Price
Final pricing depends on project scope and complexity. Request a custom quote for your specific project.
Trusted by Ontario Businesses
Results that speak for themselves
150+
Decommissions Completed
85%
Material Recycled
5-Day
Avg. Completion
They decommissioned an entire 40,000 sq ft warehouse in 5 days and left the floor in better condition than when the racking was installed.
Property Manager
Industrial REIT
Frequently Asked Questions
Common Questions Answered
Components are sorted into three categories: reusable (resold or repurposed), recyclable (metal recycling), and waste (disposed of per regulations). We provide documentation of disposal methods for your records.
Yes. We remove anchor bolts, fill holes with engineered grout, and patch any floor damage. For leased buildings, we ensure the floor meets lease-return conditions.
3-7 days is typical depending on facility size and complexity. A standard 20,000 sq ft warehouse can be cleared in 3-4 days. Larger facilities or those requiring extensive floor remediation may take longer.
Yes. If your municipality requires permits for demolition or removal work, we handle the application process and ensure compliance with local regulations.
What Typically Comes Next
Related services our clients often bundle
Supply & Design
Replacing old racking? We design and supply new systems optimized for your current needs.