Protect & Maintain
Racking Decommissioning

Safe, Compliant Racking Removal

The Problem: You're closing a facility, reconfiguring your layout, or replacing outdated racking. But you can't just pull it apart with a forklift — uncontrolled disassembly creates collapse risk, floor damage, and environmental liability.

Why It Matters: Rack systems under load are under tension. Removing the wrong component first can cause cascading failures. Anchor bolts leave holes in your concrete that need professional remediation. And if you're in a leased building, the landlord expects the floor returned in good condition.

Our Solution: Our decommissioning crews follow engineered removal sequences that prevent structural failures. Every component is removed, sorted, and staged for disposal, recycling, or resale. Anchor holes are filled and floors are remediated. You get a clean facility ready for its next use.

Schedule Decommissioning

How It Works

Our Proven Process

1
Removal Plan & Sequence
Engineered removal sequence that prevents structural failures. We plan the order of disassembly to maintain stability throughout the process.
2
Bay Unloading Coordination
We coordinate with your team to systematically unload bays in the correct sequence. Staging areas are designated for inventory and components.
3
Systematic Disassembly
Component-by-component removal following the engineered sequence. Materials sorted for reuse, recycling, or disposal as specified.
4
Floor Remediation & Cleanup
Anchor bolt removal, hole filling, floor patching, and final cleanup. The facility is returned in clean, lease-return condition.

What's Included

Everything in Our Service Package

Engineered removal sequence
Supervised bay unloading
Systematic component removal
Material sorting (reuse/recycle/dispose)
Anchor bolt removal
Floor patching & remediation
Debris removal & disposal
Environmental compliance documentation

Pricing Transparency

Upfront pricing so you can plan with confidence

Standard Decommission
$25/position
Per pallet position removed
Starting Price
Floor Remediation
Custom Quote
Quoted based on floor condition
Starting Price
Salvage Credit
Offset Available
Salvage value may reduce costs
Starting Price

Final pricing depends on project scope and complexity. Request a custom quote for your specific project.

Trusted by Ontario Businesses

Results that speak for themselves

150+
Decommissions Completed
85%
Material Recycled
5-Day
Avg. Completion

They decommissioned an entire 40,000 sq ft warehouse in 5 days and left the floor in better condition than when the racking was installed.

Property Manager
Industrial REIT

Frequently Asked Questions

Common Questions Answered

Components are sorted into three categories: reusable (resold or repurposed), recyclable (metal recycling), and waste (disposed of per regulations). We provide documentation of disposal methods for your records.
Yes. We remove anchor bolts, fill holes with engineered grout, and patch any floor damage. For leased buildings, we ensure the floor meets lease-return conditions.
3-7 days is typical depending on facility size and complexity. A standard 20,000 sq ft warehouse can be cleared in 3-4 days. Larger facilities or those requiring extensive floor remediation may take longer.
Yes. If your municipality requires permits for demolition or removal work, we handle the application process and ensure compliance with local regulations.

What Typically Comes Next

Related services our clients often bundle

Supply & Design

Replacing old racking? We design and supply new systems optimized for your current needs.

Learn More →
Installation

Installing new racking in the cleared space? Our crews handle the full transition.

Learn More →
Relocation

Moving racking to another facility instead of decommissioning? We handle relocations too.

Learn More →

Need Racking Removed?

Safe, compliant racking removal with floor remediation. We handle everything from disassembly to disposal.