Pallet racking inside a Pickering, Ontario warehouse in the Brock Road industrial area
Pickering · Ontario

Pallet racking installation in Pickering, by the GTA team that lives here.

Supply, design, install, inspect, repair, relocate. Salaried 416 crew — no subcontractors. CSA A344-17 aligned. 2-3 weeks for new installs · 24-48hr on-site for emergency repair.

CSA A344-17 aligned ANSI MH16.1 (RMI) Bill 41 documented WSIB insured In-house since 2011
Pickering coverage

Serving Pickering’s warehouse operators.

Pickering’s industrial activity centres on Brock Road and the nuclear-adjacent supplier ecosystem feeding the OPG station — specialty fabricators, valve and pump distributors, and the precision parts suppliers that nuclear operators trust. These floors prize documentation: every rack hit gets logged, every repair gets a signed report, every inspection gets filed in a way that satisfies CNSC adjacent auditors. 416 brings that documentation discipline by default — signed PDF reports, full part traceability, engineer-stamped drawings where required on every install. Same crew quotes the job and signs the inspection.

Industries served

nuclear supplier ecosystem · specialty fabrication · distribution · light manufacturing

Neighbourhoods we work in

Brock Industrial · Liverpool · Bay Ridges · Whitevale · Cherrywood

Lead time

2-3 weeks for new installs · same-day acknowledgement on emergency repair · 24-48 hr on-site

Compliance

CSA A344-17 aligned · ANSI MH16.1 (RMI) · Bill 41 documented · WSIB insured

Why 416

Why 416 for Pickering warehouse operators.

Salaried crew — predictable timeline

No subcontractors. The team that quotes the job is the team that installs it and signs the inspection. Schedule slip risk: structurally lower than the multi-sub model.

GTA-based — same-day emergency

Brampton, Vaughan, Markham — doesn’t matter where in the GTA the rack hit happened. We acknowledge same-day, on-site inside 48 hours. National chains can’t match this.

Engineer-stamped drawings where required

Stamped drawings, load placards, anchor-pull documentation. Municipal-permit-ready. Audits pass first time — we’ve never had a Pickering-area install fail a third-party inspection.

CSA A344-17 aligned — defensible documentation

Inspection reports formatted MLITSD-ready for filing. Repair logs traceable per upright. The package your insurer and inspector actually want.

CSA A344-17 ANSI MH16.1 / RMI WSIB INSURED MLITSD-READY BILL 41 COMPLIANT
Recent work

Recently completed in Pickering.

Case studies

Pickering case studies coming Q3 2026

We’re working with several recent Pickering clients on case-study permissions. In the meantime, the case-studies index has reference projects from across the GTA.

Browse all case studies
Also serving nearby cities

Also serving nearby cities.

Ready to start a Pickering project?

Send your floor plan and we’ll come back with a quote within 5 business days. Or call to walk through the project on the phone.

60 seconds · no obligation · across the GTA · (647) 692-4416