Pallet racking in Burlington, installed by the team that lives in the GTA.
Supply, design, install, inspect, repair, relocate. CSA A344-17 aligned. 2-3 weeks for new installs · CFIA-aligned food storage specialty.
Serving Burlington's warehouse operators.
Halton manufacturing belt along the QEW with significant food, beverage, and chemical distribution. 416 Industrial has been delivering pallet racking solutions across the Greater Toronto Area since 2011 — including dozens of installs across Burlington and the surrounding industrial corridors.
Our local presence means lower lead times on emergency repairs, on-site walks within a few business days of your request, and a service crew that knows Burlington's permitting + zoning quirks before the project starts.
Services delivered in Burlington.
Supply & Design
Stamped CAD layouts, BOM, permit package. CSA A344-17 aligned every design.
Explore →Installation
Anchor-tested footplates, beam-locked frames, signed install certificate. Load placards posted.
Explore →Inspection
Annual + post-impact certified inspections. MLITSD-ready signed PDF reports.
Explore →Repair
Same-day acknowledgement, on-site within 24-48 hr. CSA-aligned replace-not-repair.
Explore →Relocation
Teardown, transport, re-install. Same crew end-to-end. Cargo insurance included.
Explore →Decommissioning
Lease-end teardown + buyback. Landlord sign-off package documented.
Explore →Ready to start a Burlington project?
Send your floor plan and we'll come back with a quote within 5 business days. Or call to talk through your project.