Finished rows of new orange racking with wire decks in the North York unitNorth York, November 2026: the rows up, with wire decks.

New racking in an empty unit

Install: North York, November 2026

We walked the empty unit at the site visit in October 2026. The frames, beams and wire decks came on a truck, and the crew stood the rows up.

Get a quote

Rather talk? Call or text (647) 692-4416.

After: the same unit with the new rows of racking up (North York install) Before: the empty unit in North York BeforeAfter
Drag the handle: the same unit before and after the install.

An empty unit: rows of new racking

Kind of business
Wholesaler
The racking
New frames, beams and wire decks
Bays
24
What we did
Designed the floor plan, sourced and delivered the racking, and installed it
How it ended
Up by the customer’s date

How it went

  1. The empty unit with a grey floor at our site visit in October 2026 (North York install)
    Empty at the site visit
  2. Frames, beams and wire decks arrive on a truck with its own forklift (North York install)
    Parts on the truck
  3. Orange frames and beams going up along a wall, with wire decks on the upper levels (North York install)
    Rows going up